Adders
Electrical, project, and equipment adders
Electrical Adders
Adder | Description |
---|---|
200A MPU | A Solar Ready 200A |
Recessed panel w/MPU | When a panel is recessed in the wall also needs MPU |
Recessed panel | When a panel is recessed in the wall |
Main Panel Relocation | Labor and Materials for an "Overhead" |
Sub Panel Addition | |
Sub Panel Upgrade | |
Sub Panel Tie in | |
Derate | |
400A to Solar Ready 400A | |
400A MPU | |
Existing System Expansion | |
Garage Mounted Equipment | |
Trenching |
Project Adders
Adder | Description |
---|---|
Permitting | See "permitting" in Solo |
25 year extended inverter warranty | Extends SE inverter from 12 to 25 years |
Small System <5kW | |
Travel Adder | 100-199 OR 200+ miles |
Ground Mount | |
Flat Roof Standard | |
Steep Roof >34° | |
Attic Conduit Run | Conduit run in attic - HO request only |
Equipment Adders
Adder | Description |
---|---|
Panels | See "equipment" in Solo |
SE Energy bank w/back up | Back up loads added to a sub panel |
SE Energy bank NON back up | Offset consumption |
Additional Energy bank | |
SE Hub Inverter (battery ready) | Makes easier for HO to add battery later |
Tesla PW w/backup | Back up loads added to a sub panel |
Tesla PW NON back up | Offset consumption |
Additional PW's |